NEW – Vehicular travel restricted on Old Avon, Garrett Street between 6th Street SE & Old Avon and Levy Avenue.
Flagging on Garrett Street, East South Street, Old Avon Street, Graves Street and Monticello Road. Sidewalk Closure on 9th/Avon Street, Garrett Street, Old Avon Street and Graves Street. Crosswalk closure at the Garrett/6th Street SE intersection, on the southern leg across Old Avon at Garrett and the western leg across Garrett at the 9th/Avon/Garrett/Levy intersection.
Water Street under the Bridge – Vehicular traffic flagged and southern sidewalk closed.

posted in: Traffic Alert 0

A sanitary sewer pipe is being relocated on Garrett Street.  Garrett Street’s closure will change on Tuesday, April 12th.  Garrett Street will be reopened to vehicular travel between 6th Street SE and the driveway entrance at 310 Avon Street.  Garrett Street will then be closed between 310 Avon Street and the signalized intersection of 9th/Avon/Garrett/Levy.  The vehicular detour will be along Old Avon to East South Street to 6th Street SE.  On Friday, April 15th, westbound vehicular traffic ONLY will be reopened on Garrett between Old Avon and 6th Street SE with flagging and Old Avon will be closed at the signalized intersection of 9th/Avon/Garrett/Levy through to the next week.  Sewer service will not be interrupted.

Flagging will also occur within the intersection of Garrett Street and 6th Street SE for sanitary sewer work.

To accommodate this utility work, segments of sidewalk and crosswalks will also be closed as work progresses.  No street will have both sides of the sidewalk closed at the same time.  The northern sidewalk on Garrett Street will be closed between 6th Street SE and the driveway entrance to 310 Avon Street OR between the driveway entrance to 310 Avon Street to Old Avon with pedestrians directed to the southern sidewalk.  One leg of the crosswalks at the Garrett Street and 6th Street intersection will be closed at one time with pedestrians directed to the other three, open crosswalks. The southern crosswalk across Old Avon and the western crosswalk across Garrett at the 9th/Avon/Garrett/Levy signalized intersection will be closed with pedestrians directed to the other three, open crosswalks. 

Vehicular traffic will be flagged on Old Avon as well as East South Street to install new stormwater pipe.

The eastern sidewalk along 9th/Avon Street will be closed between Levy Avenue and Graves Street to relocate private utility lines.  Pedestrians will be directed to the mid-block crossing at Graves Street across 9th/Avon Street as well as the crosswalks at 9th/Avon/Levy/Garrett intersection.  Graves Street between 9th/Avon and Monticello Road as well as Monticello Road between Graves Street and Old Avon will be flagged intermittently.  These impacts are expected through the end of April 2022.  Levy Avenue will be closed to westbound outgoing traffic at the signalized intersection of 9th/Avon/Garrett/Levy as CenturyLink relocates lines to a manhole within the roadway.

The southern sidewalk along Old Avon Street will be closed between Monticello Road and where it terminates near East South Street.

Monticello Road will be flagged intermittently between Graves Street and Old Avon Street as a temporary wall is erected to prepare for the permanent wall/bridge construction.  The northern sidewalk along Graves Street will be closed between Monticello Road and 9th/Avon Street.

Vehicular traffic under the bridge on Water Street will be flagged intermittently as construction vehicles enter and leave the work zone.  The southern sidewalk will be closed and pedestrians will be directed to the northern sidewalk.  Both impacts are expected for several months as construction begins on the new pier.

Pedestrian access will be maintained throughout the project area and access to private parcels will be accommodated.

Construction is being conducted by Caton Construction Group, Inc. for the City of Charlottesville’s Department of Public Works. The pedestrian pushbuttons at the 9th/Avon/Levy/Garrett intersection have been relocated to the large, wooden signal poles (NE, NW and SW corners) and an auxiliary wooden post with metal conduit (SE corner).

Work zone is posted at 25 MPH – please drive carefully with phones down.