Daytime flagging on 9th/Avon Street. Daytime work at 9th/Avon/Garrett/Levy/Old Avon intersection and 9th/Avon/East Market intersection. Southbound left turn lane at Levy Avenue will be removed. Work Zone extended north of East Market Street in the far right lane of Northbound 9th/Avon Street. Construction Vehicles entering/existing work zone north and south of bridge. Old Avon closed between Garrett Street and East South Street. Flagging on 9th/Avon Street, Old Avon, East South Street, Monticello Road, Graves Street and Water Street. Water Street is one-way westbound between 10th Street NE and 4th Street SE. Sidewalk Closure on 9th/Avon Street, Pavilion Ramp, Garrett Street, Old Avon Street and Water Street. Crosswalk closures at 9th/Avon/Garrett/Levy/Old Avon intersection, 9th/Avon/East Market intersection and along Water Street.

posted in: Traffic Alert 0

Vehicular traffic on 9th/Avon Street between East Market Street and Graves Street will be flagged one day.  Traffic will be stopped intermittently as the jersey barrier that allowed half of the bridge to be constructed at a time is picked up and removed from the construction area.  Work will take place between 9am and 3pm.  

Daytime work continues at both the East Market Street intersection of 9th/Avon Street as well as Garrett Street/Levy Avenue intersection which will require temporary closure of lanes on the side streets.  All movements (straight, right, left) will be accommodated but please pay attention to workers as lanes may shift or be closed.  Only one intersection will be impacted at a time.

The southbound left turn lane from 9th/Avon Street onto Levy Avenue will be blocked and signal head bagged to accommodate stormwater work across 9th/Avon Street.  Local traffic may turn left at Levy Avenue from the southbound lane (yielding to on-coming traffic) or turn left on Hinton Avenue to Monticello Road to Levy Avenue.

The work zone has been extended north of East Market Street in the far right lane of Northbound 9th/Avon Street.  Barrels have been placed in the right NB lane to protect the new stormwater inlets as well as new signal pole. 

Construction vehicles will be entering/exiting the work zone on 9th/Avon Street both north and south of the bridge and railroad tracks.  Please watch for flagging on 9th/Avon Street as these vehicles enter/exit the travel lanes.

Old Avon is closed between Garrett Street and East South Street to continue construction of a retaining wall for the new pedestrian plaza. 

Old Avon, East South Street (between Old Avon and Graves Street), Monticello Road (between Graves Street and Old Avon) and Graves Street (between 9th/Avon Street and Monticello Road) will be flagged as utility relocation continues, materials are moved and pedestrian lighting is installed. 

Vehicular traffic at the bridge on Water Street will be flagged with both pedestrian and vehicular travel being intermittently stopped for vehicles entering/exit the work area.  Water Street has been reduced to one lane in the westbound direction between 10th Street NE and 4th Street SE.  Detour signs direct eastbound traffic to 2nd Street SE to Garrett Street to 9th/Avon Street to East Market Street to 10th Street NE to Water Street.  On-street parking spaces are available on both sides of Water Street while Water Street is one-wayed (please park with vehicle pointed in the same, westbound direction).

The sidewalk detour on Water Street will change as needed to allow work on either side of the street.  The northern sidewalk on Water Street will remain closed between the pedestrian underpass and the bridge.  Pedestrians will be directed to the southern sidewalk (east of the bridge) and the western crosswalk at the Transit Center to the northern sidewalk to destinations to the west.  The eastern crosswalk at the Transit Center will be closed.  The pedestrian underpass to the Pavilion/Downtown Mall is open and remains available as an alternative route for pedestrians.

To accommodate construction, segments of sidewalk and crosswalks will also be closed as work progresses.  No street will have both sides of the sidewalk closed at the same time.  The western sidewalk will remain closed along 9th/Avon between East Market Street and Graves Street.  The western sidewalk along 9th/Avon between Graves Street and Garrett Street will be reopened so the eastern sidewalk along 9th/Avon between Graves Street and Levy Avenue can be closed for signal construction.  Please use the crosswalks across 9th/Avon at Graves Street and the Levy Avenue/Garrett Street intersection.  The pedestrian ramp south of the Pavilion leading to 9th/Avon Street is closed so pedestrians should use 7th Street NE or another adjacent side street to reach East Market Street and 9th/Avon Street.  The northern sidewalk along Garrett Street will be closed between the entrance to 310 Avon Street and Old Avon Street with pedestrians directed to the sidewalk on the opposite side of the street.  The southern sidewalk along Old Avon Street is closed between Monticello Road and where it terminates near East South Street.

During the signal construction, one or more corners of an intersection will be closed at a time with pedestrians directed to the crosswalks across the other legs of the intersection.  The NW, SW and SE corners will be closed one at a time at the Levy Avenue/Garrett Street intersection.  The southern and eastern crosswalks will be closed at the East Market intersection.  A pedestrian detour will be erected to allow pedestrians to travel to the east by directing everyone west along East Market Street.  Those wishing to travel to the east on East Market Street will be directed to turn left onto 7th Street NE to the Transit Station, down the ramp to Water Street and then to 10th Street NE back to East Market Street.  Flaggers will be on hand during the detour during the day to assist anyone wishing to travel east on East Market Street at the 9th/Avon/East Market intersection.

ADA Deficiencies: Existing ramps at the northeast and southeast corners or Market and 9th Street used as alternate routes do not have truncated domes. Cross slopes on sidewalks at driveway entrances exceed 2%.  In the instance that pedestrians are attempting to head east/west along Market Street and the southeast ramp is closed, the detour will be along existing sidewalks along 10th Street and E. Jefferson.  10th Street sidewalk does have a slope greater than 8%.Temporary solar powered lights have been installed along the eastern sidewalk of 9th/Avon Street between Graves Street and East Market Street.  An alternate pedestrian route to either Water Street or East Market Street is available via Garrett Street to 4th Street SE.

Pedestrian access will be maintained throughout the project area and access to private parcels will be accommodated.

Construction is being conducted by Caton Construction Group, Inc. for the City of Charlottesville’s Department of Public Works. The pedestrian pushbuttons at the 9th/Avon/Levy/Garrett intersection have been relocated to the large, wooden signal poles (NE, NW and SW corners) and an auxiliary wooden post with metal conduit (SE corner).

Work zone is posted at 25 MPH – please drive carefully with phones down.